TECHNICAL DESCRIPTION
To renovate the former hospital in Rovigo, an access scaffolding was used to support the various work phases. To ensure an efficient and safe intervention, an external scaffolding structure was built to repair the plaster and consolidate the existing frames.
Project: Renovation of ex Hospital Rovigo (RO) Italy
Scaffolding: Edilponte frame bushing lock 105×180
Weight: 87300 kg
Volume: 5310m3




At the same time, specially designed scaffolding were set up inside the building to allow the installation of the load-bearing beams of the new roof. Each solution adopted was developed in compliance with current regulations, guaranteeing stability, safety and full compatibility with the needs of the construction site.
The use of PON CAD software has allowed the construction company to optimize time and resources, reducing difficulties and ensuring high operational efficiency.